Ferndale, Michigan
Peter Basso Associates (PBA) was retained by Honeywell Building Solutions to provide controls retro-commissioning for the following buildings in the Ferndale Public Schools district:
Our services included functional testing of large equipment; including boiler plants, rooftop units and air handling units, as well as smaller equipment such as classroom unit ventilators, kitchen make-up air units and perimeter heating systems. We verified equipment schedules, checked controls system setpoints, evaluated system operation, identified deviations in the control system setpoints, and found maintenance/repair items.
Latest industry insights from the best
Peter Basso Associates was retained as Commissioning Authority by MSU Federal Credit Union during the schematic design phase of the project to assist the contractor with commissioning
Learn More →This project included design/build commissioning; however, Peter Basso Associates was retained by the contractor to assist with assuring the building systems functioned
Learn More →The Central Michigan University (CMU) Biosciences Building is a 4-story, 169,000 square foot state-of-the-art building containing research and teaching laboratories
Learn More →Peter Basso Associates commissioned the 14-story, 464,000 square foot Helen DeVos Children’s Hospital to meet requirements of LEED v2.2 EA Prerequisite 1 Fundamental Commissioning
Learn More →Like what you’re reading? Check out our MEP engineering team openings.
We promise we won't spam your inbox with unnecessary emails. Privacy Policy